Skip to content
Apolis

Deal: Oak Ridge Apartments, 200 unitsPage: Vendor profile

Vendor profile

Sample

Your trades, markets, project sizes, bonding and insurance, stated once, so each bid package shows where its scope sits against them.

Sample firms only. Your profile is saved in this browser; sign-in comes later.

The firm

As it should read on an invitation. Up to 80 characters.

Union or open shop

What you do

Choose every one that applies.

Trades

Contractors

Design and consultants

Product

Where you work

Nationwide covers every project. A state covers every metro in it.

National

Metros

States

Project size

The projects you take. Leave a line blank for no stated limit.

Bonding and backlog

For firms that bond. A design or consulting firm can leave bonding blank.

Uncompleted contract value under contract today. Enter 0 if none.

Insurance limits

What your policies carry today. Leave a line blank if you do not carry it.

Design and consulting firms.

Certifications

Optional and self-stated. Apolis does not verify them.

Certifications held

Optional. Up to 160 characters.

References

Optional and self-stated, up to three. Apolis does not contact references.

Reference 1

Name, size and type. Up to 120 characters.

A role and a company, as you want it to read.

Reference 2

Name, size and type. Up to 120 characters.

A role and a company, as you want it to read.

Reference 3

Name, size and type. Up to 120 characters.

A role and a company, as you want it to read.

How you want bid invitations delivered

Delivery

Optional. Who receives it and what to attach. Up to 280 characters.

For contractors

Being built

What a bid package from an Apolis sponsor looks like when it reaches you. Parts are still being built.

One package
Every package carries the same parts in the same order: the stage and estimate class, the building, the site and code basis, the owner's allowances, unit prices and alternates, an inclusions and exclusions checklist, and the owner's documents with their status.
One return form
Every bidder prices the same lines on the same form: general conditions as a monthly rate times months, and fee, insurance and bond as their own rates, so each number is compared line for line with the others.
Your profile beside it
State your trades, markets, project sizes, bonding and insurance once. Each package then shows the sponsor, line by line, where its scope sits against what you stated, and the gap in plain numbers where it does not.
Sent by the sponsor
Apolis never sends a bid invitation and never contacts a contractor. The sponsor chooses who to invite and sends the package from their own mail, in the form your profile asks for.
Being built
Apolis is building a network of contractors and consultants who price packages in this one format. It does not exist yet: no firm receives invitations through Apolis today, and every firm shown on this site is a sample.