Apolis

Deal: St. Louis Park West End, 200 unitsPage: Mock unit

Mock unit

Sample

Swap finishes. See the cost per unit against the spec.

Sample allowances, not a contractor's price.

Change per unit
no change
All 200 units
no change
Finish cut target
$0 of $3,000 cut
0% of the target

Your finish target. Make it work's hard cost row is a different measure: $18,089 a unit, the cut that alone reaches 7.00% on cost.

Mock unit: kitchen and living area with the selected finishesQuartz, veined3 cm edgeSoft close hinges
Change per unit: no change. $0 of $3,000 cut

Sample allowances; a contractor prices the package. Default is the spec book.

Presets

  • Countertops

  • Cabinets

  • Cabinet doors

    No cost change (sample)

  • Cabinet color

    No cost change (sample)

  • Appliances

  • Backsplash

    No cost change (sample)

  • Faucet and lights

    No cost change (sample)

  • Wall paint

    No cost change (sample)

  • Ceilings

  • Bedroom and bath floors

  • Living area floor

    No cost change (sample)

  • Window coverings

  • Smart features

  • Laundry

    Not drawn in this view.

Sample allowances, replace with the GC's unit pricing.