Screen a site in a minute
Type what you know; cost, yield on cost and the spread over the exit cap update as you type.
Adds this site to the pipeline board at Sourcing, saved in this browser.
You passed on 2 deals within 2 miles: Land price too high, Yield below target. See passed deals
- Untrended yield on cost · untrended
- 6.51%
- Spread over exit cap · over a 5.50% exit cap
- +101 bp
- Look closer
- Per unit
- $260,941
- $52,188,100 total cost
- Equity needed
- $18,265,835
- 65.00% loan to cost, $33,922,265 loan
Results
Shown on the sample land price. Type your own land price to screen your site.
The verdict is arithmetic: the spread compared with your thresholds. It is not advice, and it is not an underwriting.
Untrended NOI
$3,399,779
Value at the exit cap
$61,814,161
Value less cost
$9,626,061
- Land
- $2,000,000
- Hard cost
- $41,000,000
- Soft costs, financing and fees (22.41%)
- $9,188,100
- Total cost
- $52,188,100
- Per net rentable SF
- $292
- Gross potential rent
- $5,596,800
- Effective gross income (94.12% occupied)
- $5,267,708
- Operating expenses (35.46%)
- -$1,867,929
- Untrended NOI
- $3,399,779
Untrended and stabilized, one year. No lease-up, no construction interest schedule, no trending; rent includes other income per unit. The full model replaces each figure.
Screened deals (0)
Screened deals
Saved in this browser only. Nothing is sent anywhere.
- Screened
- 0
- Added to pipeline
- 0
- Passed
- 0
Nothing screened yet. Add a site to the pipeline or pass on it, and it appears here.