Multifamily equity, Midwest
Equity placement
for $10,000. Not 1%.
One standardized model, one deal page, a verified sponsor record, and the investors looking for exactly your deal.
Private deal rooms. Invite-only. Nothing is listed publicly.

A sample deal, underwritten in the Apolis model: the project summary, read from the same record as the deal page. See the whole model.
“Did you run it through Apolis?”
The question every investor should ask before a deck lands in their inbox. We're building the answer.
How it works
One deal, one record, start to finish
Every tool starts at the fund or the building. Apolis starts at the deal, and stays with it from first underwriting to final distribution.
Underwrite in the Apolis model
Development, acquisition, or value-add. Institutional structure, monthly engine, three-tier waterfall, sensitivity. You keep the Excel; the model is the intake.
Publish a deal page and deck
Capital stack, returns, schedule, documents, and a standard ten-question diligence sheet. The deck exports from the same numbers, so nothing drifts.
Raise, close, report
Invite investors, answer questions once on the page, record the close. Then quarterly reporting from the same record, and your actuals build your verified track record.
For sponsors
Everything a placement broker does, for $10,000 instead of 1%
Underwriting, materials, investor access, diligence, and the close. On any raise, at any size, with a verified record behind you instead of a pitch.
- Underwriting, deal page, and deck, nothing owed until you close
- A sponsor profile with verified history, not a PDF bio
- Questions answered once, visible to every invited investor
- Post-close: cap table, loans, LP statements, CPA export
- Flat placement fee once we're placing for you
For investors
Compare five deals on one page, not five spreadsheets
Every Apolis deal is underwritten in the same model and presented the same way. You see basis, downside, and the sponsor's record before you see the pitch.
- Yield on cost, DSCR, equity multiple, IRR, all computed the same way
- Projected versus actual on the sponsor's past deals
- Sensitivity on rent, cost, and exit cap, on every deal
- Set your criteria once; see only what fits
- No fees to investors, ever
Verification
Verified sponsors, not self-reported ones
Every metric on a sponsor profile carries one of three marks. Investors see which is which.
The sponsor entered it. Shown, but marked as unverified.
Apolis reviewed the closing statement, T12, or lender documents behind the number.
Confirmed by a lender, auditor, or fund administrator in writing.
Pricing
Flat numbers. No percentages.
Investors never pay. Sponsors pay nothing until a deal closes, then a flat fee that doesn't scale with the raise.
The platform
$0
- Apolis models, deal page and deck
- Investor Q&A and profiles
- Cap table, capital accounts and loan tracking
- Quarterly LP reporting, CPA export and K-1 delivery
Equity placement
$10,000flat
- Per closed raise, any size
- No tiers, no percentage, ever
- Apolis introduces, you close
The models
The Apolis models. No gate, no watermark.
Institutional-grade Excel, built the way an investment committee expects to read it. Use them in your own shop. When you're ready to raise, the same model is the intake, so your deal page is already underwritten.

The broker's job, done better, for a flat fee
Apolis is in private beta. If you're raising equity in the next six months, your deal should be one of the first ten.
- $10,000
- Flat placement fee, any raise size
- $0
- Owed before a deal closes
- Never
- Charged to an investor